Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2019 Vol.4

    Research on the Offshore Jacket Installation Method Between Two Floating Cranes
    Author of the article:Cao Deming1, Song Qingwu1, Wang Chao2
    Author's Workplace:1.Offshore Oil Engineering Co., Ltd., COOEC-Fluor Heavy Industries Co., Ltd.
    Key Words:Jacket; Duration; Floating crane; Pile; Timescale network chart
    Abstract:

    Jacket offshore installation is one of the most important parts in offshore oil and gas fields’ development.In general, one floating crane is used for offshore operation.For the project with tight installation period and narrow operating window, it is of positive significance to adopt two floating cranes for joint works to shorten the installation period.In view of the traditional operation mode and the joint mode of two floating cranes for Jacket offshore installation, quantitative analysis and study have been carried out for installation duration and ship/days, and through the engineering practice, it is confirmed that the joint mode of two floating cranes can significantly shorten the installation duration and has a certain promotional value.