Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2010 Vol.5

    Cost Control in EPC Project of South Trunk Line Western Section Double Pipelines Project
    Author of the article:
    Author's Workplace:
    Key Words:EPC; Project; Cost control
    Abstract:Summarized are experiences and lessons in cost control at each stage of "EPC" project of Southern Trunk Line West Section (Naxi Chengdu) double pipelines. It is believed that conception change strengthens responsibility sense of designers, project feasibility fully considered technically and economically provides favorable conditions for cost control, integration of pipe materials and fittings for pipelines, valve vaults and stations provides convenience for procurement, quantity of hot bended elbows and earthworks of pipeline excavation controlled strictly can save costs, programming and documented management can reduce design change, improve service quality and provide basis for successful claim.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1