Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2010 Vol.6

    Steel Pipeline Pigging Experience and Emergency Treatment in Pig Blocking
    Author of the article:
    Author's Workplace:
    Key Words:Steel Pipeline Pigging Experience and Emergency Treatment in Pig Blocking
    Abstract: Pig is likely to be blocked in pipeline during pigging operation because of many unforeseeable causes. Described is pig operation rule in pipeline, analyzed comprehensively are pig blocking causes during steel pipeline pigging operation and summarized are some measures for blockingreleasing. Taking pigging operation in Tarim Oilfield for example, introduced is the blockingreleasing process. Based on practical experience in many years, several blockingreleasing methods are put forward for pigging operators.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1