Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2010 Vol.6

    Application of Drilling Method in Earthwork Proportion Calculation
    Author of the article:
    Author's Workplace:
    Key Words:Site preparation; Earthwork proportion; Drilling; Software development
    Abstract: 

    Earthwork proportion has important guiding significance for site preparation of plant or station in mountainous area. However, up to now there is not uniform calculation method for earthwork proportion in engineering design and earthwork proportion calculation is often neglected. Summarized is an earthwork proportion calculation methodDrilling Methodaccording to engineering practices of plant construction in mountainous areas in recent years, which has strong guidance for theoretically calculating earthwork proportion.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1