Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2011 Vol.4

    Protective Measures for Construction Machineries of Oil and Gas Pipelines in Mu Us Desert
    Author of the article:
    Author's Workplace:
    Key Words:Mu Us Desert;Oil and gas pipeline;Protective measures for construction machinery;Sand barrier
    Abstract:Protective measures for oil and gas pipelines passing through Mu Us Desert are very important. The geomorphic units of the desert where oil and gas pipelines are installed are stationary dunes,half stationary dunes and mobile sand dunes. According to actual conditions in Mu Us Desert,detailed are measures for protecting construction machineries used in pipeline installation in this area,including sand barrier type,sand barrier height and construction method,spacing of sand barriers,which have been applied in pipeline installation construction in Mu Us Desert and may be applied in pipeline installation construction in future similar projects.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1