Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2012 Vol.3

    Application of Two and A Half Station Layout Process in Tahe Oilfield
    Author of the article:
    Author's Workplace:
    Key Words: Automation; Unattended; Skid-mounted well selection valve group; Application; Two and a half station layout; Skid-mounted metering technology; Optimization
    Abstract: With continuous scientific and technical development, automation, digitalization and modularization construction have been propose in one after another oil fields of China. Automation and modularization oil field construction are mainly involved in oil and gas surface gathering and transportation processes and measurement of single well oil gas and water flow is very important. Traditionally, adopted is the dynamometer diagram method in many oil fields for oil measurement, the method will be affected by various kinds of factors and flow coefficient will change frequently, which results in large errors of gas and liquid flow measurement in some oil wells and severe pollution in oil measurement and accordingly, automation and modularization oil field construction can not be realized fundamentally. Since 2006, unattended skid-mounted well selection valve group was tried successfully in Tahe Oilfield. Subsequently, the technology has been applied widely in overall development of Tuoputai block and good benefit has been obtained. Application of skid-mounted metering technology in Tahe Oilfield has brought global optimization of its oil and gas surface gathering and transportation system.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1