Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2012 Vol.5

    Application of NAT M Tunnel Method in Gas Pipeline Crossing Tunnel and its Optimization
    Author of the article:
    Author's Workplace:
    Key Words: NAT M tunnel method; Tunnel; Gas pipeline; Experiment; Process optimization; Drilling; Angle
    Abstract:The rock of Jiajia Ridge Tunnel is of hard texture if New Austrian Tunneling Method NAT M is applied its construction is very difficult and require a lot of labor and cost. In order to speed up construction progress many trials are conducted and construction techniques are optimized. Selected is wedge cut and optimized are materials and types of drill rod and boring bit and priming system. Meanwhile such measures are taken as drill hole sealing adjustment of drill hole layout and angles control of drilling cut hole angle to 40°  50°and expansion of free face of tunnel face. Work efficiency is improved obviously the construction progress is accelerated and construction costs are reduced greatly after construction techniques are optimized.

     

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1