Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2013 Vol.3

    Study on Cascade Type LNG HYSYS Computation Model
    Author of the article:
    Author's Workplace:
    Key Words:Cascade type; Natural gas liquefaction; HYSYS; Simulation; Peak shaving
    Abstract: LNG peak shaving station in Pudong, Shanghai, is the first liquefied natural gas peak shaving facility in China and its construction has produced profound influence in domestic LNG industry. In the peak shaving facility construction, adopted was the new cascade type natural gas liquefaction process imported from Gaz de France, the process represents the current international trend of the development of natural gas liquefaction process. Because no simulation computation results of the facility are available, some parameters can not be optimally controlled during its operation. In order to optimize the operating parameters, adopted is the international famous HYSYS software for simulation, analysis, research and calculation and found out are control points of some key parameters and the obtained results can provide theoretical basis and guidance for natural gas liquefaction process design.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1