Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2013 Vol.5

    Determination of Detection Technology in New-built Metering Station
    Author of the article:
    Author's Workplace:
    Key Words:Metering station; Influence factor; Detection technology
    Abstract: In order to determine testing process of new-built metering stations,it is necessary to know the factors which will affect testing results and conduct comprehensive analysis on various factors so as to finalize one optimum process. Introduced are three types of testing processes widely used at home and abroad at present,such as bypass process,straight row process and loop process,analyzed are advantages and disadvantages of each process and their application conditions and it is pointed out that testing process shall be determined according to local market demand,costs,air supply,exhaust pipes and other factors. Taking certain metering station in Xinjiang for an example,conducted is analysis on the factors one by one affecting the testing process of the metering station and straight row is finalized as its optimum process.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1