Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2014 Vol.2

    Study on Oil Mixture Volume at Zhengzhou Station in Lan-Zheng-Chang Product Oil Pipeline
    Author of the article:Ding Jungang, Zhang Lei, Liu Jia, Shen Liang, Wang Zhongliang, Yu Tao
    Author's Workplace:1. China National Petroleum Cooperation Beijing Oil & Gas Control Center;2. PetroChina Pipeline Inspection Technology Co., Ltd.
    Key Words:Lan-Zheng-Chang Pipeline; Batch transportation; Oil mixture volume; Cutting
    Abstract:

    In product oil pipeline batch transportation, mixed oil will be inevitably formed and oil mixture volume decrease becomes indispensable for oil product pipeline operation and management. Calculated is the oil mixture volume at Zhengzhou station in Lan-Zheng­Chang oil product pipeline, conducted is comparative analysis on the actual oil mixture volume data obtained at Zhengzhou station in recent two years and found out is the cause of actual large cutting volume at the station: unreasonable shutdown interface position and long valve stroke time. Proposed are such suggestions as change of one manifold into two manifolds for oil delivery in the tank area, addition of a density meter, decrease of the number of shutdown and unification of density meter calibration.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1