Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2014 Vol.3

    Cathodic Protection System Commissioning in Natural Gas Treatment Plant
    Author of the article:Liu Hailu, Zhang Guohu, Ma Hanyue, Chen Zhangbing, Chi Yao
    Author's Workplace:1.China Petroleum Engineering Co., Ltd. Southwest Company,2.China Petroleum Engineering Co., Ltd.
    Key Words:Natural gas treatment plant; Cathodic protection; Cathodic polarization
    Abstract:

    In order to solve such problem as data instability occurring in cathodic protection system commissioning of a certain natural gas treatment plant, conducted are field test, data recording and comprehensive analysis and, such factors are ruled out one by one as external temperature influence and external power network voltage influence and it is ultimately clear that instable cathodic protection system data result from incomplete cathodic polarization of the protected objects and large size of cathodic protection power supply equipment. Therefore, it is very important to reasonably select size of cathodic protection equipment based on the protected objects in cathodic protection system design and the protected objects shall be completely polarized before cathodic protection system commissioning.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1