Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2014 Vol.5

    Setting of Natural Gas Pipeline Venting System and Corresponding Solutions
    Author of the article:Bu Xiangjun, Hu Ying, Zhang Hongliang
    Author's Workplace:1.PetroChina Pipeline Construction Administration;2PetroChina Natural Gas & Pipeline Company;3.PetroChina Pipeline Company
    Key Words:Natural gas pipeline; Vent; Standard; Problem; Analysis; Suggestion
    Abstract:According to engineering practice in the past, blowdown vent is installed in gas pipeline valve vault and blowdown vent with ignition function is installed at gas pipeline station. Affected by blowdown vents and thermal radiation of flares, site selection of gas pipeline valve vaults and stations becomes an outstanding issue in project construction. Aiming at PetroChina gas pipeline construction situation, conducted is contrastive analysis on current standards for natural gas blowdown vents at home and aboard. In combination with domestic natural gas blowdown system design, construction and operation and problems existing in this issue, proposed are some referable suggestion for revising current China national standards.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1