Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2015 Vol.3

    Selection of Instrument Isolation Valves in Full Containment LNG Storage Tank Top
    Author of the article:Li Guangxin, Si Hongtao, Yang Gongsheng, Lian Liwei, Li Lei, Zhang Qiangqiang
    Author's Workplace:Offshore Oil Engineering Co., Ltd.,
    Key Words:LNG storage tank; Instrument system; Cryogenic valve; Valve selection
    Abstract:

    In order to solve the problem that no basis can be followed in selection of instrument isolation valves in full containment LNG storage tank top and cryogenic valves are used conservatively in practical engineering design, conducted is analytical investigation on functions and operation and maintenance processes of such instrument isolation valves and structural requirements of LNG medium to crγogenic valves in codes, standards and specifications. Meanwhile, considered are design parameters of LNG storage tank and nozzle design in LNG storage tank top, conducted is constrastive analysis on cryogenic valve structure and found out is the theoretical basis for selecting instrument isolation valves and such conclusion is drawn that carbon steel valves or austenitic stainless steel valves can be used as instrument isolation valves in LNG storage tank top and it is not necessary to use cryogenic valves. Successful application of carbon steel valves or austenitic stainless steel valves in Tianjin floating LNG project shows that such selection is reasonable and much cost can be saved and procurement cycle can be shortened.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1