Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2015 Vol.4

    Analysis on Construction Quality Control of Large LNG Storage Tank
    Author of the article:Fu Maolin, Zhou Hongtao
    Author's Workplace:1.Petrochemical Engineering Quality Supervision Station Zhongyuan Oil Substation, 2.SINOCHEM Huayou Construction Group Co., Ltd.,
    Key Words:LNG storage tank; Construction quality; Key process; Quality supervision
    Abstract:LNG storage tank has complex structures, with many construction procedures and cross operations, construction quality control difficulty is large. Taking 16 x 104m3 LNG tank construction in a LNG receiving station project as an example, introduced in detail are supervision and management of key processes of the project from such aspects as behavior quality and physical quality, analyzed are quality problems occurring in the construction process and corresponding corrective and management measures and summarized are some effective quality supervision methods, which can greatly standardize construction quality behaviors of involved parties and ensure construction quality.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1