Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2016 Vol.2

    Optimization of Startup Scheme for Submarine Gas Pipeline of Ghana National Gas Company
    Author of the article:Huang Chongshun, Zhu Ningning
    Author's Workplace:China Petroleum & Chemical Corporation Zhongyuan Oilfield Company
    Key Words:Submarine pipeline; Optimization; Put into production
    Abstract:

    The submarine gas pipeline from Ghana's Jubilee oilfield to gas treatment plant as Ghana's first submarine gas pipeline is of great significance to the improvement of Ghana's domestic energy structure and relief of domestic power supply shortage. Due to technical issues such as rich heavy hydrocarbon in gas composition, the diameter of submarine pipeline varying from DN 250 to DN 300 and large dropping variance and so on, common methods for submarine pipeline start-up are not applicable. Simultaneous operation of drainage, drying and start-up has been realized successfully by selecting pig properly, optimizing drainaing scheme, which provides experiences for the start-up of deep-sea submarine pipeline.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1