Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2016 Vol.2

    Discussion on Development and Production Mode of Small Natural Gas Well
    Author of the article:Li Wenfeng, Liu Jun, Gao Xin, Wang Hailan, Yang Fan, Ban Jiuhong
    Author's Workplace:China Petroleum Engineering Co., Ltd. Southwest Company
    Key Words:Small gas well; LNG factories; Modularization; Skid-mounted; Integrated; Marginal field; Scattered field; Unconventional field
    Abstract:For natural gas well of small output, such as 1030 × 104 m3/d, small LNG factories could be built nearby. According to the characteristics of gas production process, skid-mounted process design method can be used for this kind of LNG factories by the method of modular division. For modularization design method, it integrates the main equipments and process pipes in a single or multiple layers of steel structures by building blocks. All the blocks will be transported to site for reset installation after manufacturing and assembling in factory, featuring fast installation and start-up, and time&cost-saving. A LNG plant construction mode with high efficiency, quickness and mobility has been established and applied lo actual production.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1