Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2016 Vol.2

    Prospect of Waste Heat Recovery of Gas Turbine Application of Long Distance Natural Gas Pipeline
    Author of the article:Xiu Yuxiang
    Author's Workplace:Sinopec Petroleum Engineering Corporation
    Key Words:Gas turbine; Organic Rankine Cycle; Waste heat recovery; Economic benefits; Social benefits
    Abstract:The temperature of exhaust from gas turbine is usually up to 500 . Its direct discharge to the atmosphere caused great deal of heat waste and heat pollution. Due to low efficiency and low economic benefit of traditional recycling, in this paper, current situation of utilization of gas turbine waste heat was analyzed and Rankine cycle of waste heat recovery for power generation or driving a small power compressor was put forward to save energy and improve energy utilization rate. Besides its economic benefits and social benefits were analyzed and the outlook for waste heat recovery of gas turbine is prospected.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1