Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2017 Vol.3

    Author of the article:
    Author's Workplace:
    Key Words:
    Abstract:

    In the process of the gas well production of Dongsheng gas field, issues have been existed in drainage gas recovery such as immeasurable liquid, undefined bubble row filling system, difficult drainage of low pressure gas well and difficult production recovery of high liquid well. Based on analysis of existing issues and technical difficulties in this article, measures as pressure and temperature test of downhole choke well, package metering of single-well, "underground heat insulation and ground throttle", pumping drainage gas recovery test and improved construction technology of gas lift have been put forward. Certain understanding and achievements have been achieved about drainage gas recovery of downhole throttling well, which lays a solid foundation for stable and efficient development of Dongsheng gas field, meanwhile provides reference for drainage gas recovery of similar gas reservoir.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1