Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2018 Vol.2

    Optimization of BOG System Operational Mode in LNG Terminal
    Author of the article:Zhou Yuhan, Yang Weihong, Cai Zhubin, Zhao Zhizhou, Cui Weiyong, Xu Boda
    Author's Workplace:CNOOC Zhejiang Ningbo LNG Co., Ltd.
    Key Words:LNG terminal; Tank; BOG compressor; Energy consumption
    Abstract:

     Based on one LNG terminal boil off gas (BOG) recovery with high energy consumption, the relationship between the pressure of LNG tank and the control load of BOG compressor is analyzed. The optimization of operation mode of BOG system isproposed. After optimized operation, the tank pressure remains stable, and the stability of BOG evaporation is increased, which prevents BOG compressor from running at the fully capacity. At the same time, LNG terminal energy consumption is reduced, economic benefits is also increased. This method can provide reference for the operation of other LNG terminals.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1