Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2018 Vol.5

    Comparative Analysis of Water Treatment Technology of Gasfield on the Right Bank of Amu Darya River Block B
    Author of the article:Li Shibing1, YangYing2, Liu Mingchu3, Wan Qunfeng4, Lu Chenggang3, Zhou Mingbing2
    Author's Workplace:1.International Business Cooperation Department, Turkmen Project Department, PetroChina Southwest Oil & Gasfield Company; 2. Storage Management Office of PetroChina Southwest Oil & Gasfield Company; 3. PetroChina Overseas Exploration and Development Company
    Key Words:Right bank of Amu darya river;Gasfield water;Oil flotation; Air flotation; Processing technology;Contrast
    Abstract:

    In order to solve the issue that the gas field water treatment capacity of natural gas treatment plant at the right bank of Amu Darya river block B can't meet the production of upstream gas field, ensure rapid construction and investment recovery,PetroChina Amu Darya Gas Exploration and Development company in China takes the lead to organize technical forces from research institutes and construction companies to carry out field research at the gasfield of Amu Darya rive and initially form water treatment technology of “hydrogen sulfide removal by gas stripping + air flotation" and the skid-mounted technology of “hydrogen sulfide removal by oxidation + oil flotation”, which operates smoothly after put into use and effectively solves the issue of water treatment at gasfield. At the same time, combined with the actual production conditions, application is optimized and performance is improved as well to enhance the efficiency of gasfield production at Amu Darya river.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1