Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2019 Vol.2

    Discussion on Cost Reduction and Efficiency Enhancement for Gas Purification Project at Design Stage
    Author of the article:Chen Yunqiang
    Author's Workplace:China Petroleum Engineering & Construction Corp. Southwest Company
    Key Words:Gas purification; Cost reduction and efficiency enhancement; Design; Energy saving and consumption reduction; Process unit
    Abstract:

    Cost reduction and efficiency enhancement involve the whole life cycle of project design, procurement, construction, operation and maintenance. However, engineering design is the key link of cost reduction and efficiency enhancement in natural gas purification project.The main way of cost reduction and efficiency enhancement in design phase is to reduce project investment, save energy and reduce energy consumption.The measures of reducing cost and increasing efficiency in engineering design stage are discussed with regard to the process of desulfurization, dehydration, sulfur recovery and tail gas treatment of natural gas purification project.It is concluded that design can be optimized the and investment be reduced by optimizing the overall process plan, process plan and process flow of the plant, properly selecting equipment and valves, practicing inter-discipline collaborative 3D modeling in construction drawings, and performing joint examination for 3D model, promoting modular design and other measures.The design can be optimized and energy consumption can be reduced by optimizing desulfurization device, dehydration device, sulfur recovery device, tail gas treatment device.The results can provide reference for reducing cost and increasing efficiency of natural gas purification projects.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1