Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2020 Vol.1

    Analysis on Stability of HDPE Pipe Road Crossing in Australia Coal Bed Gas Project
    Author of the article:Qin Xuan, Song Daishiyu
    Author's Workplace:China Petroleum Engineering & Construction Corp. Southwest Company, Chengdu, Sichuan, 610041, China
    Key Words:Coal bed gas; HDPE pipe; Stability; Australia; Road crossing
    Abstract:

    The pipeline stability analysis is receiving increasing attention in natural gas pipeline engineering recently,however there are no relevant standards for HDPE pipeline stability calculation applied to natural gas in China.Through the contrastive analysis with GB 50332-2002 and AS 2566.1, the stability method of Australia natural gas pipeline engineering is applied according to the data of a certain natural gas gathering project in Australia.The result shows that the Chinese GB 50332-2002 Structural Design Code for Pipelines of Water Supply and Waste Water Engineering for HDPE pipe is basically agree with AS 25661 Buried Flexible Pipelines in Australia. But there are more analysis parameters to be considered in Australia.At the same time, the buried depth of pipeline based on domestic standard is more conservative.The Study can provide reference for projects.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1