Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2020 Vol.1

    Research on Gas Source Dispatching Operation Strategy of Shanxi Gas Power Plant
    Author of the article:Huo Xiaoliang
    Author's Workplace:Shanxi Gas Industry Group Co., Ltd.,Taiyuan, Shanxi, 030032, China
    Key Words:Interchangeability; Shanxi; Blending; Gas power plant; Coalbed methane
    Abstract:

    As the largest user of Shanxi natural gas (coalbed methane) gas structure, gas power plant's requirements for gas quality directly affect the dispatching of Shanxi gas pipeline network.Moreover, according to the investigation and analysis of the gas-fired power plants in operation, there are some problems such as unstable calorific value and blockage of filter screen, which brings hidden dangers to the operation safety of gas-fired power plants.Combining with the actual situation of gas consumption in Shanxi gas power plant, this paper analyses and calculates various modes of gas mixing, and gives several modes of gas mixing in gas power plant, which can provide reference for gas source dispatching in gas enterprises.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1