Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2020 Vol.1

    Study on Energy Consumption Cost Optimization of Long-Distance Insulated Oil Pipeline
    Author of the article:Wang Qiankun1, Zhang Zhaofu2, Tian Xuesong2, Chen Weicong2
    Author's Workplace:1. PetroChina Pipeline Company, Langfang, Hebei, 065000, China 2. China Petroleum Pipeline Engineering Co., Ltd., Langfang, Hebei, 065000, China
    Key Words:Hot oil pipeline; Optimal operation; Energy consumption cost; Energy saving and cost reduction
    Abstract:

    The energy consumption cost usually accounts for 30% of the oil pipeline operational costs.And with the increasing efforts of national environmental protection and carbon emission control, energy consumption cost has become one of the key points of reducing cost and increasing enterprise benefit.Conventional optimization only considers the optimization of thermal and power consumption,and both of them are considered independently.Considering the significant changes in the oil and gas market and the national electrical reform policy in recent years,if the thermal and power consumption are converted into cost, the optimal operating conditions of energy consumption and cost will be different.Taking a long-distance insulation pipeline as an example, the differences between the optimum energy-saving operation condition and the lowest energy consumption cost operator are cleared,and the potential optimization space of energy consumption cost is tapped out.The results show that there is a big difference between the energy-saving operation mode and the lowest operation mode of energy-consuming cost.The energy-consuming cost can be effectively reduced by implementing oil and gas burning conversion and reasonable choosing electricity bill settlement method.This study provides guidance for reducing operation cost and improving economic benefit of hot oil pipeline.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1