Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2021 Vol.4

    Failure analysis on cracking of 4130 steel casing of an offshore platform water injection pump
    Author of the article:YANG Zhongna1, ZHAO Jieying2, MENG Qiang1, XIA Minglei1, JIN Lei1, YANG Yang1
    Author's Workplace:1. CNOOC (Tianjin) Pipeline Engineering Technology Co., Ltd., Tianjin, 300452, China; 2. Zhanjiang Branch of CNOOC (China) Co., Ltd., Zhanjiang, Guangdong, 524000, China
    Key Words:Water injection pump; Cracking; Failure analysis; Corrosion fatigue
    Abstract:An offshore platform injection pump casing cracked after 3 months of operation. In order to find out the cause of the casing cracking, failure analysis was conducted by macroscopic morphology analysis, Non-Destructive Testing (NDT), anatomical analysis, microscopic analysis (SEM), corrosion products analysis (XRD & EDS), physical and chemical performance analysis and finite element analysis. The analysis results showed that the injection pump had excessive carbon content, poor seawater corrosion resistance, and severe stress concentrations at the intersection of the horizontal and vertical inner bore (6 oclock and 12 oclock location). The failure of water injection pump was due to fatigue corrosion caused by a combination of corrosion and alternating stress In this paper, recommendation is made to avoid or mitigate such incidents in future, which is of great significance to ensure the safe operation of the platform water injection system.
    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1