Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2022 Vol.6

    Study on optimization method of working system of plunger gas lift drainage gas production well
    Author of the article:XIAO Yuyang1,2, LI Junliang1,2
    Author's Workplace:1. School of Petroleum Engineering, Yangtze University, Wuhan, Hubei, 430100, China; 2. China Key Laboratory of Drilling and Production Engineering for Oil and Gas, Wuhan, Hubei, 430100, China
    Key Words:Gas well; Plunger gas lift; Working system; Movement characteristics; Dynamic simulation
    Abstract:

    As an economical and effective technology, plunger gas lift is widely applied in drainage gas production. At present, the adjustment of working system of plunger gas lift drainage gas production wells usually depends on field experience, which is difficult and inefficient. Based on the analysis of gas production, liquid production and plunger movement speed under different working conditions, the rising process of the plunger is divided into three stages in accordance with the its operating characteristics. Based on the basic motion equation of the plunger, the solution method of the motion equation of the plunger in each stage is studied and the dynamic simulation software system of the plunger gas lift drainage gas production is developed as well. Through case study, the system can effectively simulate the production performance of plunger gas lift drainage gas well under different working conditions and provide a basis for determining a rational working system. Finally, field application of a well test shows that the average gas production is increased from 16 323 m3/d to 18 724 m3/d and the average drainage is increased from 1.73 m3/d to 1.87 m3/d, which provides reliable theoretical basis for the field application of plunger gas lift.

    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1