Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2023 Vol.6

    Challenges and countermeasures of managing multiple connections-pullback in horizontal directional drilling of oil and gas pipelines
    Author of the article:LAI Siyu1, TIAN Yanbin2, QIN Zhengxian1, LIU Xuemei1, XIANG Yuqi1
    Author's Workplace:1. CPECC Southwest Company, Chengdu, Sichuan, 610041, China; 2. Langfang Huayuan Mechanical & Electrical Engineering Co., Ltd., Langfang, Hebei, 065001, China
    Key Words:Directional drilling; Multiple connections; Pullback
    Abstract:

    With the wide application of horizontal directional drilling technology, the method of multiple connections-pullback, primarily referring to those involving dozens of connections, is crucial in addressing the issue of spatial constraints at the drilling site. Nonetheless, this method does come with its own set of limitations. By analyzing and comparing various engineering examples, this paper aims to highlight the differences and technical challenges between multiple connectionspullback and traditional pullback methods in the context of horizontal directional drilling. This paper also proposes potential countermeasures, offering theoretical references and successful experiences for future projects of the same nature. The multiple connectionspullback method is suitable for application under stable formation conditions such as bedrock. Each process must be closely connected, and the suspension time of pullback should be minimized to ensure a successful construction process. When combined with methods such as pipelaying ship and support frames for pipe sending, the multiple connectionspullback method holds significant promise for widespread applications.