Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2024 Vol.4

    Progress and prospects of drilling and completion technologies for stabilizing and increasing production in Bohai Oilfield
    Author of the article:LIU Dongdong1,2, ZHANG Qilong1,2, WENG Haoyang1,2, YU Jiansheng1,2, WEN Haitao1,2
    Author's Workplace:1. CNOOC China Ltd., Tianjin Branch, Tianjin, 300459, China; 2. State Key Laboratory of Offshore Oil and Gas Exploitation, Beijing, 102209, China
    Key Words:Bohai Oilfield; Drilling and completion; Well slot resources; Water control; Fracturing
    Abstract:

    During the production process, Bohai Oilfield faced many challenges, such as tight well slot resources, restrained reservoir production capacity release, and intensified high water cut in water flooded reservoirs. Through technical research and engineering practice, a production-enhancing drilling and completion technology system had been develped in Bohai Oilfield, characterized by efficient utilization of well slots and wellbore, offshore hydraulic fracturing, and efficient water control technology for flooded reservoirs. The main technical achievement indicators include: The full angle change rate of medium and short radius sidetracking technology reached up to 18.97°/30 m, and the blind spot of near-bit inclination measurement was shortened from 23 m to 0.6 m, overcoming the technical bottleneck; The fracturing and packing technology enabled a single six-layer fracturing and packing operation within the 177.8 mm casing, surpassing the operational limit; The integrated technology innovation of packing adaptive sand control and water control adopted a structure of double layer screen tube, inner layer base tube without drilling, achieving the dual goals of water control and sand control. Faced with the engineering and technical challenges in the future, it is recommended to continue to tackle key issues in shallow water wellhead mining mode, refined and controllable ultrashort radius sidetracking technology, large-scale offshore fracturing operation mode, and multidisciplinary collaborative water control mode to provide technical support for achieving stable and increased production targets in Bohai Oilfield.