Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2025 Vol.2

    Analysis on constraints and strategies for long cycle operation of gas field treatment plant
    Author of the article:CHEN Lei1, ZHAO Jing2, WANG Lihui1, KONG Lingfeng1, CHEN Qingguo1, TAN Peng1
    Author's Workplace:1. PetroChina Tarim Oilfield Branch, Korla, Xinjiang, 841000, China; 2. China Special Inspection Pipeline Engineering(Beijing) Co., Ltd., Beijing, 100020, China
    Key Words:Gas field treatment plants; Long cycle operation; Constraints
    Abstract:

    Inspection, repair and maintenance are the ways to ensure safe operation of natural gas treatment plant. At present, some gas field treatment plants still adopt the maintenance mode of one maintenance shutdown per year. While increasing the frequency of maintenance is more conducive in keeping track of the operating conditions of the plants, a high-frequency maintenance approach not only impacts production and raises costs but also causes fluctuations in process parameters of the facilities, which can easily lead to equipment failures. To explore long cycle operation of gas field treatment plants, this paper investigates the key constraints affecting the extension of operation cycle for these plants, identifies the critical restrictive factors, and proposes optimization strategies to address them. In addition, an optimization method of the scheduled inspection date of special equipment has been developed. These findings provide enterprises with a methodological basis for extending the interval between maintenance cycles of gas field treatment plants.