沙漠工程中超限设备的运输吊装及费用
Over-sizing Equipment Transportation,Lift and Installation and Relative Costs in Desert Project
浏览(2322) 下载(3)
- 引用格式:
-
廉永红,韩莉,李婷婷.沙漠工程中超限设备的运输吊装及费用[J].天然气与石油,2010,28(4):0.doi:
.Over-sizing Equipment Transportation,Lift and Installation and Relative Costs in Desert Project[J].Natural Gas and Oil,2010,28(4):0.doi:
- DOI:
- 作者:
- 廉永红1,韩 莉2,李婷婷2
- 作者单位:
- 1.中国石油塔里木油田造价中心2.中国石油集团工程设计有限责任公司西南分公司
- 关键词:
- 固体脱硫塔;运输;吊装;概算;费用
Solid desulfurization tower;Transportation;Lifting;Estimation;Cost
- 摘要:
- 固体脱硫塔是气田脱硫工程的重要设备之一。通过对地处沙漠腹地的塔中6气田脱硫工程的固体脱硫塔吊装方案的介绍,详细分析了固体脱硫塔吊装费用及运输费用,为沙漠工程的概预算编制中大型设备的费用计算问题提供了一些借鉴和参考。
Solid desulfurization tower is one of important equipment in gas field desulfurization project.Described are lifting options for the solid desulfurization tower of Tazhong 6 Gas Field desulfurization project in Xinjiang desert hinterland,analyzed are lifting and transportation costs of the tower,which has some reference values for budget estimate of large equipment costs in desert projects.