气田处理装置长周期运行制约因素及策略
Analysis on constraints and strategies for long cycle operation of gas field treatment plant
浏览(2427) 下载(8)
- 引用格式:
-
陈磊,赵静,王立辉,孔令峰,陈庆国,谭鹏.气田处理装置长周期运行制约因素及策略[J].天然气与石油,2025,43(2):122-127.doi:10.3969/j.issn.1006-5539.2025.02.016
CHEN Lei, ZHAO Jing, WANG Lihui, KONG Lingfeng, CHEN Qingguo, TAN Peng.Analysis on constraints and strategies for long cycle operation of gas field treatment plant[J].Natural Gas and Oil,2025,43(2):122-127.doi:10.3969/j.issn.1006-5539.2025.02.016
- DOI:
- 10.3969/j.issn.1006-5539.2025.02.016
- 作者:
- 陈磊1 赵静2 王立辉1 孔令峰1 陈庆国1 谭鹏1
CHEN Lei1, ZHAO Jing2, WANG Lihui1, KONG Lingfeng1, CHEN Qingguo1, TAN Peng1
- 作者单位:
- 1. 中国石油天然气股份有限公司塔里木油田分公司, 新疆 库尔勒 841000; 2. 中特检管道工程(北京)有限公司, 北京 100020
1. PetroChina Tarim Oilfield Branch, Korla, Xinjiang, 841000, China; 2. China Special Inspection Pipeline Engineering(Beijing) Co., Ltd., Beijing, 100020, China
- 关键词:
- 气田处理装置;长周期运行;制约因素
Gas field treatment plants; Long cycle operation; Constraints
- 摘要:
保障气田处理装置安全运行的方式为“检”“修”和“保养维护”。目前部分气田处理装置仍采取“一年一检修”的检修模式,提高检修频率更有利于掌握装置的运行情况;但高频率的检修不仅影响产量、增加检修成本,也会导致设施工艺参数的波动,容易引起设备故障。为探索气田处理装置长周期运行,对当前延长气田处理装置检修周期的关键制约因素开展了研究,明确了关键制约因素,并针对关键制约因素提出了优化策略;建立了特种设备定检日期优化方法。为企业开展气田处理装置延长检修周期工作提供了方法依据。
“Inspection”, “repair” and “maintenance” are the ways to ensure safe operation of natural gas treatment plant. At present, some gas field treatment plants still adopt the maintenance mode of “one maintenance shutdown per year”. While increasing the frequency of maintenance is more conducive in keeping track of the operating conditions of the plants, a high-frequency maintenance approach not only impacts production and raises costs but also causes fluctuations in process parameters of the facilities, which can easily lead to equipment failures. To explore long cycle operation of gas field treatment plants, this paper investigates the key constraints affecting the extension of operation cycle for these plants, identifies the critical restrictive factors, and proposes optimization strategies to address them. In addition, an optimization method of the scheduled inspection date of special equipment has been developed. These findings provide enterprises with a methodological basis for extending the interval between maintenance cycles of gas field treatment plants.