Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2014 Vol.6

    Application of Monitoring and Early Warning Technology in Tunnel Crossing Design of Long-distance Pipeline Project
    Author of the article:Zhou Weijun, Zhang Yao, Li Yuexiao, Zhang Fan
    Author's Workplace:PetroChina Tarim Oilfield Company Oil & Gas Sales Department
    Key Words:Monitor; Tunnel; Long-distance pipeline; Safety
    Abstract:In order to enhance the monitoring and early warning management on geological disasters in long-distance pipeline tunnel crossing, prevent or mitigate risks to pipeline due to geological condition change in tunnel, analyzed are data obtained in continuous three monitor stages of displacement, settlement, stress and fissuring and analysis results show that no tunnel displacement occur up to now. However, short-term monitoring results cannot reflect tunnel displacement change. Tunnel monitoring shall be continued and early warning management on tunnel geological disasters shall be strengthened constantly so as to ensure safe operation of the long-distance pipeline.

     


    CopyRight©2025Natural Gas and Oil Editorial Office Reserved 京ICP备11013578号-1