Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2018 Vol.2

    The Start-Up Operation of Long Distance Liquid Pipeline via Supervisory Control Center
    Author of the article:Chen Hongjun1,2, Dai Wenping1, Yu Tao1,3
    Author's Workplace:1 CNPC Beijing Oil & Gas Regulation Center, Beijing, 100007, China 2 School of Software and Microelectronics. Peking University, Beijing, 100871, China 3 College of Pipeline and Civil Engineering. China University of Petroleum
    Key Words:Liquid pipeline;Commissioning;Condition control;Problems;Measures
    Abstract:

    In order to ensure the success of commissioning and trial operation on remote liquid pipeline control, the control center need to make full preparations from multiple aspects including automatic test, the preparation of basic materials, simulation and field training, the HMI interface drawing of SCADA system and common production reports after commissioning. Besides, the division of responsibilities of relevant departments is important as well. The management of information during the production process is mainly completed by scheduling order, SMS and presentation form. The control of oil throughput during the commissioning period is mainly executed through varieties of ways including calculating with curve estimation tracking, liquid level accounting of buffer tank and friction loss checking. When tracking the oil-water interface we should establish a back pressure and reduce the shutdown time. The regulations given above, together with the throughput control method, the tracking and control of oil-water interface, the identification and control of abnormal valve connection and other relevant points for attention, can provide regulators with guidance on executing the commissioning and guarantee the safety and efficiency of liquid pipeline.