Internet Workstation

Edition and Publication

Edition and Publication:
< Natural Gas and Oil > Editorial Department
Hosted by:
China Petroleum Engineering & Construction Corporation Southwest Company
Authorized by:
China Petroleum Engineering & Construction Corporation
Co-hosted by:
Overseas Research Center of Research Institute of Petroleum Exploration and Development
Editor in Chief:
Du Tonglin
Vice Editor in Chief:
Tang Xiaoyong,Pu Liming
Address:
No.6, Shenghua Road, High-tech District, Chengdu, Sichuan, China
Postal Code:
610041
Tel:
028-86014709
028-86014500
Email:
cnpc-ngo@cnpc.com.cn
Issue:ISSN 1006-5539
          CN 51-1183/TE

Links

    Your Position :Home->Past Journals Catalog->2022 Vol.3

    Structural design of suction pile anchor pad eye for deep water engineering vessel
    Author of the article:XU Tiantian1, GAO Dehuan2, ZHANG Meirong3
    Author's Workplace:1. CNOOC China Ltd., Tianjin Branch, Tianjin, 300459, China; 2. CNOOC Safety Technology Service Co., Ltd., Tianjin, 300452, China; 3. China Offshore Oil Engineering Company, Tianjin, 300451, China
    Key Words:Suction pile; Cast anchor pad eye; Offshore installation tolerance; Finite element analysis; Heat treatment
    Abstract:

    The semi-taut spread mooring system is adopted for deep water engineering vessel, and the structural design of anchor pad eye on suction pile shall guarantee mooring safety. This paper introduces the technical requirements of mooring system and suction pile anchor pad eye design and offshore installation in the Company's General Specifications. The maximum offset of engineering vessel and tension of mooring line is calculated by ARIANE7 software. The inverse catenary shape of bottom chain embedded in soil is analyzed by numerical iterative solution of governing differential equations method so as to determine mooring load at anchor pad eye on suction pile. The structural strength and stability of suction pile caisson and anchor pad eye is analyzed by ABAQUS software, in which the links lever arm effect on anchor pad eye main plate is simulated, and the influence of lateral fabrication deformation of V-wing plate inside suction pile caisson is considered. The anchor pad eye is made of low-carbon silicon manganese cast steel, with the stress-relief done by heat treatment to guarantee the mechanical and wear resistance properties. This suction pile anchor pad eye design can be used as a reference for engineering design of deep water suction pile of the same nature.